Hiring in life sciences? Share your open positions with our professional community. Read more Close

Advertisement

Hypoxia: a critical pathophysiological driver in respiratory inflammatory diseases.

Created on 12 Sep 2026

Authors

Bing Zhong, Lan Yang, Si-Lu Sun, Hong Chen, De-Yun Wang

Published in

Military Medical Research. Volume 13. Issue 1. Pages 100023. Epub Apr 18, 2026.

Abstract

Hypoxia is a central pathophysiological driver of inflammatory airway diseases, shaping disease progression largely through hypoxia-inducible factor 1α (HIF-1α) signaling. Across these disorders, hypoxia exacerbates airway inflammation through shared mechanisms. As a key signaling hub, HIF-1α disrupts epithelial barrier integrity and initiates inflammatory cascades; reprograms immune responses, promoting the activation and trafficking of eosinophils, T cells, and macrophages while reshaping cytokine profiles, to drive tissue injury; and accelerates airway remodeling, thereby worsening airflow limitation and perpetuating inflammatory cycles. Realizing effective targeted therapies will require rigorous validation of HIF-1α as a therapeutic node and the development of disease-tailored interventions aligned with distinct pathological features. In parallel, strengthened translational and clinical research on hypoxia is essential to build a robust evidence base for practice. This review synthesizes hypoxia-driven mechanisms shared across airway diseases, articulates a unifying framework for HIF-1α signaling across pathological contexts, and highlights the therapeutic implications of fundamental discoveries. By addressing the paucity of cross-disease analyses of hypoxia pathways, it provides both a conceptual foundation and a practical roadmap for developing precise and efficient targeted therapies for inflammatory respiratory diseases.

PMID:
42063458
Bibliographic data and abstract were imported from PubMed on 12 Sep 2026.

Read full publication at:
Please sign in to see all details.

Advertisement

Stats

  • Community rating n/a 0 votes
  • Reviewers' rating n/a 0 votes
  • Your rating

1-terrible, 9-excellent. How would you rate this publication? Sign in in to submit your rating.

  • Recommendations n/a n/a positive of 0 vote(s)
  • Views 6
  • Comments 0

Recommended by

  • No recommendations yet.

Post a comment

You need to be signed in to post comments. You can sign in here.

Comments

There are no comments yet.

Advertisement